老澳门开奖直播

Seattle, Washington

?

Seattle Clean-Up Timeline 2020

Seattle Clean-Up Timeline 2020

UPDATE - 2020

US-EPA Accepts Lockheed West Seattle Superfund Site Remedial Action Construction and Completion (RACCR) Report – September 2020

The US Environmental Protection Agency (EPA) - Seattle Region 10 has documented acceptance of the Remedial Action Construction and Completion Report (RACCR) for the Lockheed West Seattle Superfund Site, Seattle, Washington, effective September 30, 2020.

Remediation of the site cleanup was designed by the 老澳门开奖直播. The work was overseen by US-EPA Region 10. Remediation actions were substantively completed in March 2020. There was on-going work regarding institutional controls (covenants).

The remaining activities on this site are identified in the EPA approved Remedial Action Work Plans for Long-term Maintenance and Monitoring and Institutional Control Implementation and Assurance Plan (Lockheed, 2018).

These covenants are required for owned and/or managed property parcels by the Port of Seattle and the Washington Department of Natural Resources.

Five-year reviews are required for the site starting in August 2023.

The report and confirming memo are available for public review at these links:?Remedial Action Construction and Completion Report (RACCR)?for the Lockheed West Seattle Superfund Site, Seattle, Washington, effective September 30, 2000;?US-EPA Confirmation Memo.

History

Elliott Bay is used for a variety of recreational purposes, including fishing, canoeing and kayaking. The Muckleshoot and Suquamish Native American Tribes use the area for commercial and subsistence fishing. The area also provides habitat critical to Chinook salmon, which the federal government has listed as a threatened species.

Lockheed Shipbuilding and other maritime companies operated the former shipyard for approximately 45 years. 老澳门开奖直播 discontinued its operations at the Lockheed Shipyard No. 2 in 1987.

Discovery

It is believed that historical uses of the facility — shipbuilding, repair and maintenance activities — have resulted in contaminated sediments.

The sediments are habitat to numerous fish and other aquatic species, and are within a migratory corridor for endangered, threatened and other anadromous fish, which are fish that move from salt to fresh water to lay their eggs.

Historical shipyard contaminants of potential concern include

  • polychlorinated biphenyls (PCBs)
  • polycyclic aromatic hydrocarbons (PAHs)
  • organic compounds, mercury and other metals.
  • Other contaminants not directly associated with shipyard activities also may be present at the site.

Elliot Bay

Elliot Bay

The Port of Seattle

The Port of Seattle (The Port) purchased the property in 1992.

  • The Port cleaned up the land area of the old shipyard under Washington State Department of Ecology oversight.
  • The property is currently part of The Port’s Terminal 5, which is a container shipping facility.
  • 老澳门开奖直播 is responsible for cleanup of the aquatic sediments portion of the property, and the U.S. Environmental Protection Agency (EPA) is overseeing this activity.

Investigation

老澳门开奖直播 has prepared a Remedial Investigation/Feasibility Study (RI/FS) to better understand the contamination and to develop a cleanup plan.

  • The EPA approved the work plan in June 2008. To date, 老澳门开奖直播 has conducted three RI field investigations at the site to provide data for the risk assessments and the RI/FS.
  • 老澳门开奖直播 conducted an analysis of data collected during the field investigations to complete the Human Health and Ecological Risk Assessments.
  • Activities in 2009 and 2010 included the completion of the RI/FS; the EPA determination of the proposed plan; and Record of Decision.

?

Photo Tour of West Seattle Remediation Work October 2018

Photo Tour of West Seattle Remediation Work October 2018

Community Information

If you have questions, please contact 老澳门开奖直播 Communications.
lm.communications@lmco.com
800.449.4486

?

Seattle Clean-Up Timeline 2019

Seattle Clean-Up Timeline 2019

?

Superfund Site Season 1 Timeline and Major Milestones 2019

Superfund Site Season 1 Timeline and Major Milestones 2019

Seattle Fact Sheet June 2018

Remediación De 老澳门开奖直播 Seattle Oeste Ficha Técnica Verano 2018

Timeline

1900s?- Harbor Island created from wetlands; used continuously for industrial activities.

1909?-? ?Yard 1, on Harbor Island, east side of? West Waterway of Duwamish River begins operations as Puget Sound Bridge.

1943?- Yard 2, on the west side of the West Waterway begins operations. Both yards used primarily for shipbuilding, ship repair and maintenance.

1959?- Lockheed buys Yard 1.

1987?– Yard 1 operations cease.

1989?- Lockheed sells Yard 2 to Port of Seattle.

1997?– Lockheed sells Yard 1 to the Port of Seattle.

2007?- U.S. Environmental Protection Agency (USEPA) establishes Lockheed West Seattle as Superfund site.

2008?- Lockheed prepares a?Remedial Investigation/Feasibility Study (RI/FS) Work Plan;?US EPA approves the work plan.?

2012? April?– RI/FS completed.

2012? July?– USEPA issues?Proposed Plan.

2013 August?– USEPA issues?Record of Decision.

2015 March?– USEPA issues Unilateral Agreement Order for Remedial Design/Remedial Action.

2015 November – 2016 February?– Pre-design investigation underway.

2017 February?– 30% Design remedy under development.

2017 May?-?60% Design documents?released

2018 July?– Final?100% Design documents?released.

2018 Winter – 2019 Spring -?Remedy construction completed.

2020 September?-??US-EPA Accepts?Lockheed West Seattle Superfund Site?Remedial Action Construction and Completion (RACCR) Report

2019 Lower Duwamish Festival

View the Seattle West Document Archive

View a List of Terms Commonly Used in Relation to General Environmental Remediation Efforts

Glossary? ??Acronyms